Road map: Goals and Main Steps
Goals
The goals of the process established by the road map are two-fold:
- to reach consensus amongst the Contracting Parties to the Barcelona Convention with a view to formulating a joint and coordinated proposal on the designation of the proposed Med SOX ECA to the IMO; and
- (only if consensus is reached) to submit the joint and coordinated proposal for the designation of the proposed Med SOX ECA to the IMO in accordance with the rules and procedures established by the Organization, to have the proposal assessed and approved by the Organization that may consider, adopt and bring into force an amendment to regulation 14 of MARPOL Annex VI related to the designation of the proposed Med SOX ECA, and to have the proposed Med SOX ECA effectively entering into force within a reasonable and practical timeframe, as defined by the Contracting Parties to the Barcelona Convention.
Main Steps
Main steps (2020-2021):
- National actions
Milestones |
Actions |
2020-2021 biennium |
|
- Regional actions
Milestones |
Actions |
April – December 2020 |
(a) Knowledge gathering: · synopsis of the assessment; · quantification of the impacts associated with deposition of PM2.5 and air toxics; · additional detail of land-based emissions controls of SOX and PM in the Mediterranean coastal States; and · additional elements on the economic impacts on shipping engaged in international trade. (b) Further studies: · additional economic impact evaluation, more precisely: · analyses of the impacts on shipping engaged in international trade as well as on trade modal shift outside the Mediterranean; and · analyses of the impacts on short-sea shipping activity as well on the social and economic impact on Contracting Parties including on development for islands, insular and remote areas. · additional fuel supply and technology analyses (regional fuel production, fuel availability, and alternative compliance technologies);
|
by April 2021 (TBC) |
|
May 2021 (TBC)
14th Meeting of the Focal Points of REMPEC |
|
by July 2021 (TBC) |
(provided agreement was reached at the 14th Meeting of the Focal Points of REMPEC) |
September 2021 (TBC)
Meeting of the MAP Focal Points |
|
by October 2021 (TBC) |
(provided agreement was reached at the Meeting of the MAP Focal Points) |
December 2021 (TBC)
22nd Meeting of the Contracting Parties to the Barcelona Convention and its Protocols (COP 22) |
|
- Global actions
Milestones |
Actions |
27 December 2019 (TBC)
(13-week deadline for the submission of documents (including information documents) containing more than six pages of text (bulky documents) to the 75th session of the IMO’s Marine Environment Protection Committee (MEPC 75)) |
(provided agreement was reached at COP 21) |
30 March – 3 April 2020 (TBC)
75th session of the IMO’s Marine Environment Protection Committee (MEPC 75) |
|
Final steps (beyond 2021)[1]:
- Global actions
Milestones |
Actions |
by January 2022 (TBC)
(13-week deadline for the submission of documents (including information documents) containing more than six pages of text (bulky documents) to the 78th session of the IMO’s Marine Environment Protection Committee (MEPC 78))
|
(provided agreement was reached at COP 22) |
April 2022 (TBC)
78th session of the IMO’s Marine Environment Protection Committee (MEPC 78) |
· Presentation of the joint and coordinated proposal for the designation of the proposed Med SOX ECA ECA to the IMO (along with a proposed amendment to MARPOL Annex VI); · Assessment of and, agreement to, the said proposal, if any; and · Consideration and approval of a draft amendment to regulation 14 of MARPOL Annex VI related to the designation of the proposed Med SOX ECA , if any, and request to the IMO Secretary-General to circulate it in accordance with article 16(2) of MARPOL, with a view to adoption at the next session of the IMO’s MEPC, if any. |
by April 2022 (TBC)
(at least six months prior to its consideration) |
(provided agreement was reached at MEPC 78) |
October 2022 (TBC)
79th session of the IMO’s Marine Environment Protection Committee (MEPC 79) |
|
not earlier than 1 September 2023 (TBC)
(in accordance with article 16(2)(f)(iii) of MARPOL: “period shall be not less than ten months”) |
(provided agreement was reached at MEPC 79, and unless prior to the proposed date, not less than one third of the Parties or Parties the combined merchant fleets of which constitute not less than 50% of the gross tonnage of the world's merchant fleet, have communicated to the Organization their objection to the amendment) |
not earlier than 1 March 2024 (TBC)
(in accordance with article 16(2)(g)(ii) of MARPOL: “six months after its acceptance”) |
|
TBC[2] |
|
[1] only if consensus is reached amongst the Contracting Parties to the Barcelona Convention on the joint and coordinated proposal for the designation of the proposed Med SOX ECA to the IMO.
[2] This was determined to be 1 January 2025 by the Contracting Parties to the Barcelona Convention at COP22.